    City of Spokane Valley


    The City of Spokane Valley has enacted a Stormwater Ordinance in order to establish minimum stormwater management requirements and controls to protect and safeguard the general health, safety, and welfare of the public residing in watersheds within this jurisdiction.  The City of Spokane Valley is the permitting authority for all land disturbing activities and requires the land owner to maintain all on-site stormwater control facilities and all open space areas (e.g. parks or “green” areas) required by the approved stormwater control plan. The City of Spokane Valley will only provide construction permits to projects that establish a plan to manage stormwater runoff occurring during the construction process. The City of Spokane Valley, under the NPDES program, also has the authority to inspect properties for noncompliance and can issue a notice of violation (NOV) for any deficiency or infraction onsite. Property owners are responsible for the maintenance of any stormwater facilities or practices located on the property. The City of Spokane Valley  has the authority to inspect stormwater facilities and practices in order to ascertain that they are properly maintained and functioning.

    Excerpt from Spokane County Stormwater Fees Webpage

    Service Charges

    Stormwater service charges for businesses, industries, farms, apartment buildings and other non-residential land uses are calculated based on their impervious coverage as compared to the average single-family residential unit. For example, if a commercial parcel has four times more impervious coverage than a residential parcel, it is charged four times the single-family rate for the drainage service area.

    Annual charges are based on the specific rates for each of the service areas as shown below. Maps of the specific service areas are available from Spokane County Engineering and Roads, Stormwater Section.

    Annual Rates

    Drainage Service Area ERU Rate
    Glenrose $63
    North Spokane $40
    West Plains $48
    Remainder of service area $21

    Excerpt from Spokane Regional Stormwater Manual

    2.1.1 REGULATORY THRESHOLD

    The regulatory threshold is the “trigger” for requiring compliance with the Basic Requirements of this Manual. This threshold varies from jurisdiction to jurisdiction. In Spokane County and the City of Spokane Valley, it is defined as “the addition or replacement of 5,000 square feet or more of impervious surfaces or the disturbance of 1 acre or more.” In the City of Spokane, the threshold is defined as “the addition or replacement of any impervious surfaces.” The regulatory threshold applies to the total impervious area replaced or added at full build-out. Refer to “common plan of development or sale” definition to determine whether your project will trigger the regulatory threshold.

    All projects proposing underground injection control (UIC) facilities must comply with UIC requirements, regardless of whether they trigger the regulatory threshold.

    2.2.8 BASIC REQUIREMENT NO. 8 – OPERATION AND MAINTENANCE

    Objective

    To ensure that stormwater control facilities are adequately maintained and properly operated, documentation describing the applicable preventive maintenance and recommended maintenance schedule shall be prepared and provided to the entity responsible for maintaining the stormwater system.

    For drainage ponds and other drainage facilities outside of the public road right of way, the project proponent shall provide the financial means and arrangements for the perpetual maintenance of the drainage facilities.

    Proponents shall operate and maintain the facilities in accordance with an operation and maintenance plan that meets the criteria specified in Chapter 11. The operation and maintenance plan shall also include applicable source control BMPs, as described in Chapter 10.

    Applicability

    All projects that meet the regulatory threshold and that propose drainage facilities or structures shall comply with this Basic Requirement. All projects that propose UIC facilities also must comply with the operation and maintenance requirements, regardless of whether they exceed the regulatory threshold.

    11.1 MAINTENANCE –

    11.1.1 INTRODUCTION

    Insufficient maintenance of stormwater control facilities can lead to poor performance, shortened life, increased maintenance and replacement costs, and property damage.

    The local jurisdiction maintains the stormwater system structures located within the public road right of way and structures located within border easements that serve public road runoff, unless a separate agreement exists whereby the homeowner, property owner or other independent entity is responsible for the maintenance. Drainage tracts created by public projects will be maintained by the local jurisdiction. The project proponent is to provide for the perpetual maintenance of all elements of the stormwater system located outside the public right of way. The high-frequency maintenance of vegetated cover, turf grass and other landscaping within the public right of way and within border easements that accommodate public road runoff is the responsibility of the adjacent property owner. When applicable, the following maintenance-related items shall be submitted with the Drainage Submittal (refer to Chapter 3) for all projects:

    • A copy of the conditions, covenants and restrictions (CC&Rs) for the homeowners’ association (HOA) in charge of operating and maintaining all elements of the stormwater system;

    • A Financial Plan outlining the funding mechanism for the operation, maintenance, repair, and replacement of the private stormwater system, including contingencies; and,

    • An Operations and Maintenance (O&M) Manual.

    Appendix 5A and 6A of the Stormwater Management Manual for Eastern Washington outline facility maintenance recommendations and frequencies.

    11.1.2 APPLICABILITY

    All projects that meet the regulatory threshold and that propose drainage facilities or structures shall comply with the Basic Requirement for operation and maintenance. All projects that propose UIC facilities also must comply with the operation and maintenance requirements, regardless of whether they meet the regulatory threshold.

    11.1.3 HOMEOWNERS’ AND PROPERTY OWNERS’ ASSOCIATIONS

    For privately maintained stormwater systems in residential neighborhoods, a homeowner’s association, or alternate entity acceptable to the local jurisdiction, shall be formed to maintain the facilities located outside of the public right of way.

    A draft copy of the CC&Rs for the HOA in charge of operating and maintaining the facilities associated with the stormwater system shall be submitted as part of the Drainage Submittal review package. The CC&Rs shall summarize the maintenance and fiscal responsibilities of the HOA, reference the O&M Manual (Section 11.1.4), and include a copy of the sinking fund calculations and Financial Plan (Section 11.1.5). Annual HOA dues shall provide funding for the annual operation and maintenance of all facilities associated with the stormwater system and for the eventual replacement of these facilities.

    For commercial/industrial and multi-family residential developments with joint stormwater systems and multiple owners, a property owners’ association (POA) or similar entity such as a business shall be formed, or a reciprocal-use agreement executed.

    Homeowners’ associations and property owners’ associations are to be non-profit organizations accepted by the Washington Secretary of State. A standard business license is not acceptable for this purpose.

    11.1.4 OPERATION AND MAINTENANCE MANUAL

    For stormwater systems operated and maintained by a HOA or POA, an O&M Manual is required. The O&M Manual summarizes the tasks required to ensure the proper operation of all facilities associated with the stormwater system and must include, as a minimum:

    • Description of the entity responsible for the perpetual maintenance of all facilities associated with the stormwater system, including legal means of successorship;

    • Description of maintenance tasks to be performed and their frequency;

    • A list of the expected design life and replacement schedule of each component of the stormwater system;

    • A general site plan (drawn to scale) showing the overall layout of the site and all the facilities associated with the stormwater system; and,

    • A description of the source control BMPs.

    Spokane Valley Resources

    Spokane Valley Stormwater Management Program Plan

    Spokane Valley Stormwater Webpage

    Spokane Regional Stormwater Manual

    Spokane County Stromwater Fees Webpage